Use case · Monte Carlo
Monte Carlo P50/P90 PV simulation for utility-scale
Thousands of iterations to quantify resource and production uncertainty. A P50/P90 with its uncertainty band stated, not an optimistic guess — the percentile your lender's analysis works from.
P50/P90 with statistical rigor
Thousands of iterations to quantify resource and production uncertainty. A P50/P90 that states its uncertainty band.
- Thousands of Monte Carlo iterations
- P50/P90 with a stated uncertainty band
- Validated against NREL and Sandia/PVPMC
Backed by validation
Protocol, result and limits
Every result is traceable and reproducible, backed by our validation reports against NREL, Sandia/PVPMC, a production benchmark (JUST 5 MWp case) and measured production at the NIST Ground Array (−1.1% on annual energy against 371 MWh measured, one plant).
See the validation reports Next step
See it run on a project
One task, your site, and a straight answer about where we do not fit.
Request a session with an engineer